Public Defender Building, Riverside, CA

Upgrades to the Riverside Public Defender’s building began in 2010 but by the time renovation was supposed to be complete during the summer of 2014 only 30% of the contract was done. NMN took over from the previous contractor and completed the 8-story retrofit job in 5-months which included forming, drill and epoxy dowels and new structural beams.
Client: Angeles Contractor, Inc.
Total CY: 326